Posted by: notdeaddinosaur | April 4, 2014

Building a House (12)

We are progressing: garage framed out and doors installed.House-12

Several more things have happened that aren’t visible from the outside. We now have cement floors on the front porch, patio, garage and basement, plus stairs down to the basement. The half-wall that will eventually be the larger of our two kitchen islands is in place.

Still a ways to go, but getting there.